A LOGISTICAL CHALLENGE

MAINCHANGE

SMART IN FLOW CONTROL

Around 1000 machines, pieces of equipment and assembly workplaces weighing more than 100,000 kg including:

  • Around 150 assembly workplaces
  • More than 100 test benches
  • More than 50 lathes
  • 4 cranes

Around 3000 tons of material

Around 1000 office workplaces